Gelsomino sewage network lot III
Italy
1984 | 1989
The Gelsomino sewage network lot III has required the construction of the water lines built in the Via Cardinal Cassetta to Piazza della Rovere section through mechanized excavation.
A 3,9m diameter TBM has been used to bore the entire 1,132 m length.