São Paulo Metro – Line 2, Section 2

Brazil

The works comprise a twin-track main tunnel with a diameter of 10.40 metres and a length of approximately 6 km, together with two underground stations and associated infrastructure. Once completed, Lot 2 will connect São Paulo and Guarulhos through a series of interchanges with urban transport networks, both rail- and road-based. The project will extend public transport services to several city districts and significantly expand the passenger base served by the network.




Benefits
1. Extension of public transport services to several city districts. 
2. Increased public transport capacity.
3. Reduction in congestion. 
4. Reduction in journey times.
5. Reduction in greenhouse gas emissions.