Gelsomino sewage network lot III

Italy

The Gelsomino sewage network lot III has required the construction of the water lines built in the Via Cardinal Cassetta to Piazza della Rovere section through mechanized excavation.
A 3,9m diameter TBM has been used to bore the entire 1,132 m length.

Previous Next