First 5000 mts excavated in the lowering of the Sarmiento railway line Project in Buenos Aires
07-25-2018
One meter at a time, we work to leave a better world for the future generations. Today, we’ve completed the first 5000 mts of TBM excavation in the lowering of the Sarmiento railway line Project in Buenos Aires. Thanks to the construction, the city will avoid 127 railway crossings and eliminate the high mortality rate in the suburbs due to those who currently walk through the tracks.
We keep going.
Ghella, wherever there is a future to build.